This project consists of a new, 7-story, 1,774-space parking deck and long-span, steel truss, enclosed pedestrian bridge linking the parking deck to the hospital. The main structure of the deck is constructed of cast-in-place, post-tensioned concrete. All structures in this project are supported by drilled pier foundations.